Exploring Criteria for Tendering for Sustainable Urban Construction Logistics
Construction of Roads and Wildlife Mitigation Measures
The Ecological Effects of Linear Infrastructure and Traffic
Ecological Impacts of Road Noise and Options for Mitigation
Ensuring the Completed Road Project is Designed, Built and Operated as Intended
Riding the Railroad Rollercoaster
ASC 605 REVENUE RECOGNITION ASC 605 REVENUE RECOGNITION1
Experiences with longer and heavier vehicles in the Netherlands
Introduction to Design and Selection of the System
Projected state‐wide traffic forecast parameters using artificial neural networks
Twenty‐Two Years in the Making: How will it End?
Short‐term passenger flow forecast of urban rail transit based on GPR and KRR
Mining the spatio‐temporal pattern using matrix factorisation: a case study of traffic flow
PPP in Greenfield Airport Development: A Case Study of Cochin International Airport Limited
Jane Austen's Life and Letters