The Status of the SCIAMACHY Line-of-Sight Pointing Knowledge
SCIAMACHY Operations in an Extended Mission up to 2010
Determination of SCIAMACHY Line-Of-Site Misalignments
Sciamachy 4 Years in Orbit - Instrument Operations and In-Flight Performance Status
Coupled CFD-DSMC Simulations for Contamination Evaluation on Envisat Due to OCM Thruster Plumes
The SCIAMACHY Calibration/Monitoring Concept and First Results
Nadir, Limb, and Occultation Measurements with SCIAMACHY
The SCIAMACHY calibration-monitoring concept and first results
Nadir, limb, and occultation measurements with SCIAMACHY