SYSTEM AND METHOD FOR CONSTRUCTION SUPERVISION USING TOWER CRANE
SYSTEM FOR SUPERVISING CONSTRUCTION OF STRUCTURE BY USING TOWER CRANE AND METHOD THEREFOR
- Method and system for managing train based on LTE-R
- Failure diagnostic method and system based on LTE-R
Valet parking system and the method utilizing parking location map
PHOTOVOLTAIC POWER GENERATION MODULE INSTALLATION SUPPORT SYSTEM
CABLE TRAY MODULE CONSTRUCTING APPARATUS AND CABLE TRAY MODULE CONTSTRUCTING METHOD USING THEREOF
AUTOMATIC MOBILE BOGIE EQUIPPED WITH LIGHTING ROD AND THUNDERSTROKE GUIDING DEVICE INCLUDING THEREOF
PHOTOVOLTAIC POWER GENERATION MODULE INSTALLATION SUPPORT SYSTEM
METHOD TO USE AUTONOMOUS DRIVING UNMANNED STORES USING AR GLASS DEVICES AND VOICE RECOGNITION