1–20 von 666 Ergebnissen
|

    Status of the German Aircraft Propeller Industry with Minor References to Propeller-Turbine-Jet Installations

    G. T. Lampton | NTIS | 1945
    Schlagwörter: Manufacturing Processes & Materials Handling , Aeronautical engineering , Manufacturing , Germany(East and West)

    Messerschmitt Aircraft Design Development

    J. M. Shoemaker | NTIS | 1945
    Schlagwörter: Manufacturing , Germany(East and West) , Manufacturing Processes & Materials Handling , Structural engineering , Performance(Engineering)

    German Fifty-Two Centimeter 'Mamouth Press' for the Extrusion of Rocket Propellant

    R. A. Cooley | NTIS | 1945
    Schlagwörter: Industrial plants , Manufacturing , Germany(East and West)

    Reliability Program for the Xq-5 Drone

    NTIS | 1956
    Schlagwörter: Systems engineering , Manufacturing , Industrial production , Management engineering

    Samos/Midas Personnel System Specifications and Design Launch Complex 1 Point Arguello

    NTIS | 1961
    Schlagwörter: Test and evaluation , Systems engineering , Control systems engineering , Electrical engineering , Fabrication

    Confirmatory Test of the Irritant Gas Disperser, Helicopter- or Vehicle-Mounted, M5

    NTIS | 1962
    Schlagwörter: Test and evaluation , Performance(Engineering) , Production models

    SURFACE TEXTURE CONTROL

    SAE Technical Papers | 1963
    Schlagwörter: Production engineering , Production , Production control , Maintenance, repair, and overhaul (MRO) , Coatings, colorants, and finishes

    SURFACE TEXTURE CONTROL

    SAE Technical Papers | 1963
    Schlagwörter: Production engineering , Production , Production control , Maintenance, repair, and overhaul (MRO) , Coatings, colorants, and finishes

    461 Systemmaintainability

    W. N. Stark | NTIS | 1963
    Schlagwörter: Systems engineering , Manufacturing , Management planning and control

    Commercial Supersonic Transport Proposal, January 15, 1964. A-I-Airframe Work Statement

    NTIS | 1964
    Schlagwörter: Systems engineering , Production control , Management engineering , Value engineering , Management planning and control

    Commercial Supersonic Transport Engine. Volume IX-E. Engine. Part I. Management. Phase II-a. Data Submission

    NTIS | 1964
    Schlagwörter: Manufacturing , Management planning and control , Value engineering

    Commercial Supersonic Transport Program. Phase Iib Report. Reliability, Safety and Maintainability Plan

    NTIS | 1965
    Schlagwörter: Value engineering , Management engineering , Manufacturing , Management planning and control

    Program Plan Manned Orbiting Laboratory - Heat Shield Qualification (MOL-HSQ)

    NTIS | 1965
    Schlagwörter: Management planning and control , Engineering , Manufacturing

    Space vehicle production and attendant requirements

    Sheldon, J. S. | NTRS | 1966
    Schlagwörter: PRODUCTION ENGINEERING , Machine Elements And Processes

    The manufacturing engineer in the space program.

    Siebel, M. P. L. | NTRS | 1966
    Schlagwörter: PRODUCTION ENGINEERING , Machine Elements And Processes

    Valves and Valve Problems

    A. Perkins | NTIS | 1966
    Schlagwörter: Industrial & Mechanical Engineering , Manufacturing

    Supersonic Transport Development Program. Phase III Proposal. Boeing Model 2707. Volume IV-19. Standardization Program

    O. L. Paxhia | NTIS | 1966
    Schlagwörter: Value engineering , Manufacturing , Management planning and control , Management engineering

    Supersonic Transport Development Program. Phase III Proposal. Boeing Model 2707. Volume V-5. Procurement Program

    W. W. Berry | NTIS | 1966
    Schlagwörter: Manufacturing , Performance(Engineering) , Management planning and control

    Supersonic Transport Development Program. Phase III Proposal. Boeing Model 2707. Volume V-1. Configuration Management Plan

    B. Link | NTIS | 1966
    Schlagwörter: Management planning and control , Management engineering , Production

    Supersonic Transport Development Program. Phase III Proposal. Boeing Model 2707. Volume IV-18. Value Engineering Program

    NTIS | 1966
    Schlagwörter: Value engineering , Management planning and control , Production