Taking the unconventional roundabout of Huancheng West Road and Huancheng North Road in Jinhua City an example, a research about the existing roundabout is carried on. Through the project’s development, some problems have been discovered, and we put forward some optimized measures for the unconventional roundabout by way of keeping headway exactly. In addition, we optimize the object of study by utilizing the VISSIM software, with which the traffic capacity of roundabout is to develop. Afterwards, a conclusion is drawn that if the vehicles keep the time headway of 0.6S, the traffic capacity of roundabout will be four times as large as it was, with which a new way of thinking about optimizing the roundabout will be provided.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Urban Road Roundabout Method of Contrast Optimization and Research



    Erschienen in:

    Applied Mechanics and Materials ; 178-181 ; 1325-1328


    Erscheinungsdatum :

    2012-05-14


    Format / Umfang :

    4 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Urban Road Roundabout Method of Contrast Optimization and Research

    Chen, Jiong-Di / Yang, Qing / Qiu, Xin et al. | Tema Archiv | 2012


    Theory Model for Traffic Capacity of Unsignalized Roundabout in Urban Road

    Pei, Yulong / Fu, Chuanyun / Peng, Ting | ASCE | 2011


    Traffic Optimization in Urban Area - Roundabout Versus Lights Case Studies

    Filip, Nicolae / Golgot, Claudiu | Springer Verlag | 2016


    Bracknell roundabout -- Construction of roundabout under railway

    Kendal, J.T. / Palmer, R.W. | Engineering Index Backfile | 1956


    Roundabout capacity : public road experiment at Wincheap, Canterbury

    Semmens, Marie C. / Fairweather, P. J. / Harrison, I. B. | TIBKAT | 1980