In view of ballasted-CRTSⅡ ballastless track transition section on the bridge of Beijing-Shanghai high-speed railway, the influence of track random irregularity and pier foundation settlement difference on acceleration and stability index of locomotive body are discussed by the finite element method. And then, by using the index of rail deflection gradient to describe the law of dynamic interaction, rail-wheel dynamic response, attenuation distance of locomotive body acceleration and change of sleeper pressure caused by under-rail stiffness difference are analyzed. Finally, the recommended value of reasonable length of transition section is put forwarded.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Study on Reasonable Length of Ballasted-CRTS II Ballastless Track Transition Section on High-Speed Railway Bridge



    Erschienen in:

    Advanced Materials Research ; 671-674 ; 1301-1305


    Erscheinungsdatum :

    2013-03-11


    Format / Umfang :

    5 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch