The test run of ATACS (Advanced Train Administration And Communications System) which is managed by East Japan Railway Company was carried out. ATACS is a radio communication-based train control system. Hitachi, Ltd. developed three field controller sets (a set constructed form a main controller and a sub-controller), two management servers and two sets of a on-board controller for two test trains. Outputs from main and sub-field controllers are mixed and transmitted to vehicles, and these data are verified by the on-board controller. Virtual trains generated in field controllers were also used in field test runs. Open & close control and handover control of communication channels were performed in the field controllers. A hazard state never happened in these test runs.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    ATACS: first phase control system and its experimental test results


    Beteiligte:
    Yokosuka, Y. (Autor:in) / Maekawa, K. (Autor:in) / Bekki, K. (Autor:in) / Kasuya, N. (Autor:in) / Amiya, N. (Autor:in) / Kobayashi, T. (Autor:in) / Iba, O. (Autor:in) / Inage, H. (Autor:in)


    Erscheinungsdatum :

    1998


    Format / Umfang :

    10 Seiten, 4 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    ATACS: first phase control system and its experimental test results

    Yokosuka, Y. / Maekawa, K. / Bekki, K. et al. | British Library Conference Proceedings | 1998


    RESULTS OF THE FIRST MI-171A2 FLYING LABORATORY TEST PHASE

    V. A. Ivchin / K. Y. Samsonov | DOAJ | 2016

    Freier Zugriff


    RESULTS OF THE FIRST MI-171A2 FLYING LABORATORY TEST PHASE

    V. A. Ivchin / K. Y. Samsonov | DOAJ | 2014

    Freier Zugriff

    Results of the First Power Generation Test in Closed Loop Experimental Facility

    Hosaka, Masayuki / Ota, Takafumi / Nakahora, Tsukuru et al. | AIAA | 2008