One of the biggest problems for railway operation is the management of train runs during accidents or maintenance sites on double-track-lines. The consequences of these events are barrings and speed restrictions on the main track which cause delays of the trains passing the location. Therefore it is necessary to construct a new timetable based on the existing timetable in consideration of influences of the hindrances on train runs to guarantee safety with high quality. For this purpose the interactive maintenance-site-timetable-construction-system BAUPLAN is used. With a computer-aided construction system it is possible to research several variants of infrastructure (e.g. the usage of additional switches in the site area) and timetable operating strategies in only a part of the time needed today for the manual layout of train diagrams.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Ad-hoc planning of timetables for accidents or maintenance sites

    Hesselfeld, M. / Klahn, V. / Wessex Institute of Technology | British Library Conference Proceedings | 1998



    Designing alternative railway timetables under infrastructure maintenance possessions

    Van Aken, Sander / Bešinović, Nikola / Goverde, Rob M.P. | Elsevier | 2016



    Tactical Planning of Public Transport Services: Frequencies and Timetables

    Gkiotsalitis, Konstantinos | Springer Verlag | 2023