To maintain optimum efficiency, the MACHAR subsea production manifold requires frequent pigging operations to remove the wax deposits. To meet this, an innovative subsea multiple pig launcher was designed to enable single line subsea pigging operations to be carried out as an integral part of the pipeline maintenance program. The design is based on optimizing CAPEX/OPEX costs, utilizing conventional surface vessels for deployment and the provision of a reliable, fail safe, remotely-operated vehicle pig launch mechanism. Most significantly, the design provides a reliable, cost-effective, long-term pigging facility for subsea operations based on simple operation and minimum intervention times.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Design of subsea multiple pig launcher for BP ETAP


    Beteiligte:
    Smith, B. (Autor:in) / Blower, S. (Autor:in) / Ferguson, G. (Autor:in)


    Erscheinungsdatum :

    1997


    Format / Umfang :

    Seiten


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Design of Subsea Multiple Pig Launcher for ETAP

    Smith, B. / Blower, S. / Ferguson, G. | British Library Conference Proceedings | 1997


    Reforma: pervyj etap

    Belova, A. G. | IuD Bahn | 2001


    OTC 13254 Remotely Operated, Diverless Subsea Pig Launcher

    Hale, J. R. / Clegg, W. | British Library Conference Proceedings | 2001


    Kolejny etap reformowania Grupy PKP (1)

    Stowarzyszenie Inzynierow i Technikow Komunikacji Ul. Czackigo 3/5 PL - 00043 Warschau | IuD Bahn | 2004


    Universitet vykhodit na novyj etap

    Komarov, K.L. | IuD Bahn | 2002