The Los Angeles Light Rail Transit (LRT) system will open on 4 July 1990. It will interact in various ways with the heavy rail and road systems. After a general description of the system, the article discusses the need for active signal priority and the objectives which the signal system seeks to meet. The components of the system-detectors, travel time predictors and controllers, and the central computer and SCADA centre,-are described. The system's operation is then considered, and failure management is discussed.
Advanced integration of LRT and traffic signals
Das Los Angeles LRT-System (Light Rail Transit System) als Verbindung zwischen Straße und Schiene
Third International Conference on Road Traffic Control ; No.320 ; 209-214
1990
6 Seiten, 4 Quellen
Aufsatz (Konferenz)
Englisch
TIBKAT | 1931
|NTIS | 1973
|Integration of Mobile Satellite Service with Advanced Traffic Management Systems
SAE Technical Papers | 1991
|Engineering Index Backfile | 1953
|Engineering Index Backfile | 1930
|