The Swedish Transport Administration (in Swedish, Trafikverket) needed to establish a good approach on the methodology to describe the functionality and also the demands for the operation and control of the tunnel ventilation in a new and complex road tunnel. Therefore, in the Call for Tender the technical description of the tunnel-ventilation control had to be in such a format that it could be used as a software application for the system integrator. There are some difficulties you had to be aware of in this kind of contracts. The main contractor for installations in a traffic tunnel had to handle approx. 10 different technical systems. Can we really expect the contractor to be an expert or find experts on everything, especially when this tunnel project is so particular?


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Control of the tunnel-ventilation system in the northern link (Norra Länken) in Stockholm


    Beteiligte:
    Elertson, Lars (Autor:in)


    Erscheinungsdatum :

    2014


    Format / Umfang :

    6 Seiten, Bilder



    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Blå-gult på norra Jylland

    Timoleon, Tim | IuD Bahn | 2005


    Stockholm-Arlanda rail link

    Online Contents | 1995



    Submerged tunnel ventilation shaft and submerged tunnel ventilation system

    LIU SHENG | Europäisches Patentamt | 2020

    Freier Zugriff

    Energy Use and Greenhouse Gas Emissions during the Life Cycle Stages of a Road Tunnel - the Swedish Case Norra Länken

    Sofiia Miliutenko / Jonas Åkerman / Anna Björklund | DOAJ | 2012

    Freier Zugriff