The Swedish Transport Administration (in Swedish, Trafikverket) needed to establish a good approach on the methodology to describe the functionality and also the demands for the operation and control of the tunnel ventilation in a new and complex road tunnel. Therefore, in the Call for Tender the technical description of the tunnel-ventilation control had to be in such a format that it could be used as a software application for the system integrator. There are some difficulties you had to be aware of in this kind of contracts. The main contractor for installations in a traffic tunnel had to handle approx. 10 different technical systems. Can we really expect the contractor to be an expert or find experts on everything, especially when this tunnel project is so particular?
Control of the tunnel-ventilation system in the northern link (Norra Länken) in Stockholm
2014
6 Seiten, Bilder
Aufsatz (Konferenz)
Englisch
IuD Bahn | 2005
|Online Contents | 1995
Construction of Stockholm underground Central link
Engineering Index Backfile | 1958
Submerged tunnel ventilation shaft and submerged tunnel ventilation system
Europäisches Patentamt | 2020
|