ShenGuang III (SGIII) facility will be constructed for research in Inertial Confinement Fusion. In this paper, general structure layout and design of target area of SGIII facility are described. Target area structure support system must provide a stable and precisely platform for optical elements before and during a shot. General structure layout must satisfy the mul-function consideration and logistic priority. The modularity and hardware commonality, cleanliness, and low neutron activation should be considered in the structural design of target area. The general structure layout of target area is rectangle. The target bay and the switchyard have the multi-layered layout to satisfy the demand of transporting beam lasers unidirectionally from south to north and supporting the optics modules and physical diagnostic instruments with different height. The passageways of population & goods flow of target area are designed to include the vertical channels between the different layers and the horizontal channels on the same layer. The opto-mechanical elements (OM) are classified as OM1, OM2, and OM3. The OM1 are the infrastructures. The OM2 include target chamber, the shell of final optics assemblies, the mirror frames, and the beam enclosures. The OM3 is line replaceable units that are attached to the OM2 on kinematic equivalent three-vee mounts.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Novel low-cost multistage target layout design

    WANG YANG / CHEN JINGPENG / XIE XUEMING et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Shared bicycle facility layout configuration method in rail station transfer influence area

    CHEN JUN / LIU ZIJIAN / HAO JUN et al. | Europäisches Patentamt | 2021

    Freier Zugriff

    Facility Layout Optimization of Planetary Industrial Sites

    Casler, J. / American Institute of Aeronautics and Astronautics | British Library Conference Proceedings | 2011


    W8 Facility Overview and DTF Test Layout

    Joel Lauer / Julia Stephens | NTRS


    Logistics Facility Layout Based on Sequence-Pair

    Tang, Yinying / Li, Li / Liu, Hailin | ASCE | 2009