On the basis of summarizing the hydrological characteristics and shipping characteristics at the location of Chongqing Caiyuanba Yangtze River Bridge, the method of setting anti-collision bridge piers by the risk analysis was determined, and the anti-collision design program of P15 and of P16 side pier was analyzed emphatically. The anti-collision program with intercept cable, thin-walled cofferdam and structural strengthening itself were compared and the advantages, disadvantages and the scope of application of the protective facilities were discussed. Analysis showed that it was very effective to reasonably choose the pier needed to be protected emphatically so as to select protective measures program of the piers with targeted with hydrology, waterway and other information on the location combined with structural analysis. These conclusions have some guidance and reference significances for determining the anti-collision program of side pier in large bridges.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Research on Anti-Collision Program of Side Pier in Chongqing Caiyuanba Yangtze River Bridge


    Beteiligte:
    Geng, Bo (Autor:in) / Zhang, Xi (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    5 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch





    Bridge pier anti-collision early warning device and early warning method

    YUAN HAOYUN / DUAN WENJIE / XIAO TIANBAO et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Polymer composite material pier anti-collision device

    LIU HAOJIE / XU BIN | Europäisches Patentamt | 2022

    Freier Zugriff

    Bent angle type pier anti-collision soft body

    GAO RUIXUE / PAN FEI | Europäisches Patentamt | 2022

    Freier Zugriff

    Construction of the Wuhu Yangtze River Bridge

    Xuejun, Xiong / Hao, Yu | IuD Bahn | 2001