On the basis of summarizing the hydrological characteristics and shipping characteristics at the location of Chongqing Caiyuanba Yangtze River Bridge, the method of setting anti-collision bridge piers by the risk analysis was determined, and the anti-collision design program of P15 and of P16 side pier was analyzed emphatically. The anti-collision program with intercept cable, thin-walled cofferdam and structural strengthening itself were compared and the advantages, disadvantages and the scope of application of the protective facilities were discussed. Analysis showed that it was very effective to reasonably choose the pier needed to be protected emphatically so as to select protective measures program of the piers with targeted with hydrology, waterway and other information on the location combined with structural analysis. These conclusions have some guidance and reference significances for determining the anti-collision program of side pier in large bridges.
Research on Anti-Collision Program of Side Pier in Chongqing Caiyuanba Yangtze River Bridge
ICCAHE, International Conference on Civil, Architectural and Hydraulic Engineering, 2012 ; 2183-2187
Applied Mechanics and Materials ; 204-208
2012
5 Seiten
Aufsatz (Konferenz)
Englisch
Bridge pier anti-collision early warning device and early warning method
Europäisches Patentamt | 2023
|Polymer composite material pier anti-collision device
Europäisches Patentamt | 2022
|Construction of the Wuhu Yangtze River Bridge
IuD Bahn | 2001
|