Wuchang railway station expansion project was of a urgent construction period, requiring the high level of environmental protection and good quality. And to so large number of foundation engineering, the application of rotary drilling pile construction method could save time, reduce environmental pollution, and was suitable for silt, clay, sand and gravel strata. Through the engineering examples, the construction produces including scheme and technologies are introduced, and production and installation of steel casing, slurry pools and production, borehole-creating, production and hoisting of cages, concrete grouting and inspection key points are discussed in detail. The practice shows that rotary drilling pile construction method has a good overall efficiency in the expansion project of railway station.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Study on the Application of Rotary Drilling Pile Construction in Expansion Project of Railway Station


    Beteiligte:
    Lu, Zhong-Le (Autor:in) / Wu, Li (Autor:in) / Zuo, Qing-Jun (Autor:in)


    Erscheinungsdatum :

    2012


    Format / Umfang :

    6 Seiten




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Application of general contracting in railway construction project

    Shuibo, Zhang / Jianlong, Jia / Le, Zhang | IuD Bahn | 2006


    Two railway pile drivers

    Engineering Index Backfile | 1899


    Rotary dedusting charging pile

    WANG JUN | Europäisches Patentamt | 2021

    Freier Zugriff

    Fabricated buoyancy tank platform and rotary drilling construction method

    CHEN CHUANLEI / XIE MAXIAN / ZHENG WANGTAO et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Mobile charging pile for 5G base station construction

    LIU LIHUA | Europäisches Patentamt | 2021

    Freier Zugriff