The present work attempts to expose a method to increase the lines capacity. The problem to treat concerns the existing minimum number of halts ''Stops'' to reposition in order to obtain the optimum transport capacity. This applied method to a narrow way in the process of normalization allows to add to the gain capacity induces by normalization a surplus of flow. The repositioning of the halts is a correction at lower cost having for objective to differ in time the heavy investments to modernize and standardize completely a narrow-gauge line. Throughout the text the term halt ''stop'' means any establishment or equipment ensuring the cantonment on one line.
The Increased Flow of a Railway Line by Repositioning of a Minimum Number of Axes Halts
2012
6 Seiten
Aufsatz (Konferenz)
Englisch
Mishap halts Titan liftoff: Key umbilical line accidentally disconnected
Online Contents | 1994
Engineering Index Backfile | 1928
|Selection probe halts Super Tucano
Online Contents | 2012
Flooding halts Semmering pilot tunnel
Tema Archiv | 1997
|Spaceflight - Teledesic halts satellite work
Online Contents | 2002