An effective design method for controlling the transitional welding distortion at the aft upper deck occurring in the erection stage of the hull structure has been established using FEA and measured distortion database. Variation of distortion at the aft upper deck was measured according to the progress of the manufacturing process. This was done in order to clarify the 2nd distortion of the upper deck, defined as the increment of welding distortion developed after the assembly stage. The amount and distribution of the 2nd load causing the 2nd distortion were identified with a non-linear buckling FEA. The distribution of the welding distortion and the residual stress were assumed to be initial imperfections, which were identified with STEM (simplified thermoelastic method) based on inherent strain. Based on these results, the modification of structural design parameters such as plate thickness and the attachment of carling were made, in order to prevent the excessive 2nd distortion which requires costly flame correction work in the erection stage.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    A structural design approach for controlling welding distortion at the upper deck of a hull structure in the erection stage


    Beteiligte:
    Shn, S.B. (Autor:in) / Lee, D.J. (Autor:in) / Youn, J.G. (Autor:in)

    Erschienen in:

    Welding in the World ; 56 , 3/4 ; 51-63


    Erscheinungsdatum :

    2012


    Format / Umfang :

    13 Seiten, 23 Bilder, 6 Tabellen, 11 Quellen



    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch





    APPARATUS FOR SUPPORTING STRUCTURE ON UPPER DECK OF HULL

    HAM SEUNG YOUNG / KIM YONG WOON | Europäisches Patentamt | 2016

    Freier Zugriff

    Hull deck structure, hull and manufacturing method

    LI NING / LUO XIAOLIN / JIANG LINYONG et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    Marine jointed board structure, hull deck assembly, hull and manufacturing method

    LI NING / NA TIESUO / LIAN ZHAOHUA et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    METHOD FOR ANALYZING ERECTION ACCURACY OF HULL BLOCK

    HAH ZOO HWAN / JUNG SUNG JIN / IM HONG GYU et al. | Europäisches Patentamt | 2024

    Freier Zugriff