The local scheduling problems as part of a global first-in first-out (FIFO) process management policy was discussed. The method was implemented within the context of an automotive assembly plant. It was suggested that to optimize production costs it is necessary for automobile manufacturing process to create a list that schedules orders. A theoretical prespective that characterize the maximum authorized local scheduling disturbance that enables to fulfil the global management objective was also presented.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Local scheduling problems submitted to global FIFO processing constraints


    Beteiligte:
    Bernier, V. (Autor:in) / Frein, Y. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2004


    Format / Umfang :

    21 Seiten, 15 Quellen




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    DYNAMIC USER EQUILIBRIUM PROBLEM WITH LINK CAPACITY AND FIFO CONSTRAINTS

    Chen, H.-K. / Lui, S.-H. / Chang, C.-W. et al. | British Library Conference Proceedings | 2002


    Deep FIFO Surge Buffer

    Temple, Gerald / Siegel, Marc / Amitai, Zwie | NTRS | 1991




    ELEVATOR CONTROL METHOD BASED ON FIFO

    Europäisches Patentamt | 2022

    Freier Zugriff