A case study for the short-term workforce planning and allocation for labour-intensive transfer lines is addressed. Trucks are assembled on a serial line, and they show large differences in the processing times at each station. These differences are due to the assembling options provided to the customers. Given the assignment of operations to stations, we have to find a loading sequence for the products, a worker allocation and a floater time allocation to minimize the whole labour costs at the line. We develop a solution approach for this problem and, in particular, discuss the necessities and implications by considering a rolling planning horizon. Especially, when planning for a number of subsequent shifts, we have to model the time interdependencies carefully. The results of the numerical studies show that relevant savings can be achieved by using an advanced planning system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Workforce planning and allocation for mid-volume truck manufacturing: A case study


    Beteiligte:
    Gronalt, M. (Autor:in) / Hartl, R.F. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2003


    Format / Umfang :

    15 Seiten, 12 Quellen




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Statewide Truck Transportation Planning: Methodology and Case Study

    Smadi, Ayman / Maze, T. | Transportation Research Record | 1996



    Statewide Truck Transportation Planning: Methodology and Case Study

    Smadi, Ayman / Maze, T. H. | Transportation Research Record | 1996


    Statewide Truck Transportation Planning: Methodology and Case Study

    Smadi, A. / Maze, T. H. / National Research Council; Transportation Research Board | British Library Conference Proceedings | 1996


    Toward Predictive Workforce Planning

    Hinkeldein, Daniel C. | Transportation Research Record | 2009