A 24-inch diameter natural gas pipeline traversed the Sacramento-San Joaquin River Delta in 2001 and included three HDD crossings of elevated rivers or sloughs. Crossing lengths varied from 1400 to 1800 feet. Typical profiles provided for 75 feet of cover beneath the channel bottom resulting in total depths of about 100 feet beneath the entry and exit points. Each crossing was installed on the first try while injecting cement grout through the reamer during pullback. The cement grout was specifically designed for HDD applications to provide extended cyclic pumpability, resistance to flash setting, and delayed hydration. This paper discusses the components of the cement mix design as well as the procedures used during installation.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Injecting Cement Grout During Horizontal Directional Drilling (HDD) Pullback


    Beteiligte:
    Stauber, R.M. (Autor:in) / Frame, T.A. (Autor:in) / Kedzierski, M. (Autor:in)


    Erscheinungsdatum :

    2003


    Format / Umfang :

    5 Seiten



    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    HDD - Horizontal Directional Drilling

    Girmscheid, Gerhard / Schaiter, Bernhard / Schetelig, Kurt | IuD Bahn | 2006


    Autonomous Trenchless Horizontal Directional Drilling

    Gomaa, Mahmoud A. K. / Elshafei, Moustafa / Saif, Abdul-Wahid A. et al. | Springer Verlag | 2020


    Cab and horizontal directional drilling machine

    WANG SHUO / WANG MINGJIANG / LI MING | Europäisches Patentamt | 2023

    Freier Zugriff

    Consolidometer tests on fresh cement grout

    Bolton, M. D. / McKinley, J. D. | TIBKAT | 1990


    HORIZONTAL DIRECTIONAL DRILLING SYSTEM WITH OPERATOR LIFT

    TOOLEY JAMES BRIAN / LANGNER JEFFREY DALE | Europäisches Patentamt | 2022

    Freier Zugriff