In ATC (Automatic Train Control) on electrified tracks PLC (Powerline Communication) can serve as a bidirectional communication medium between train and track. Compared to the present solution using audio-frequency track circuits not only life cycle costs can be saved but it is also possible to implement additional features, e.g. driving with optimised train distance (moving block). The problem of interferences in data transfer on medium and lower voltage net can be solved using a special OFDM method (Orthogonal Frequency Division Multiplex). Prototypes have been tested successfully as well for conductor rail as for overhead line.
Powerline Communication bei der Zugbeeinflussung
2002
6 Seiten, 3 Bilder
Aufsatz (Konferenz)
Deutsch
Springer Verlag | 2022
|Linienförmige Zugbeeinflussung
SLUB | 1980
Linienförmige Zugbeeinflussung
SLUB | 1980
Vereinheitlichung der Zugbeeinflussung
IuD Bahn | 1998
|Tema Archiv | 1975
|