Simulation studies of road snow melting by dropping hot water were carried out for three representative cities in Japan for the past 23 years. Watching a wheel track, hours for which snow and ice was cleared were calculated under conditions that hot water was dropping during the time from 6.00 to 21.00 at given rate. As a result, it was shown, that the percentage of cleared time to non-cleared time in winter seasons decreases with increasing quantity of dropping hot water and begins to saturate to about 10 % at 12 l/h hot water dropping, which corresponds to 30 vehicles/h at a crossing or a slope.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Study of road snow melting using exhausted heat of vehicle - evaluation of re-freezing of melt water on road surface


    Weitere Titelangaben:

    Untersuchungen zur Schneeschmelze auf der Straße mit Hilfe der Fahrzeug-Abgaswärme


    Beteiligte:
    Suda, M. (Autor:in) / Umemura, T. (Autor:in) / Kamimura, S. (Autor:in) / Ueda, Y. (Autor:in)

    Erschienen in:

    JSAE Review ; 22 , 4 ; 577-580


    Erscheinungsdatum :

    2001


    Format / Umfang :

    4 Seiten, 5 Bilder, 4 Quellen




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch