Review of reliability aspects of a terrain following radar designed for the tsr2 aircraft, with recommendations for future improvement in reliability. Reliability testing of subunits made the largest contribution to reliability. the mtbf was increased through reliability trials and subsequent modification by a factor of about five to over 90 hr and potentially much higher with further development work. the optimum burn-in time for this equpment appeared to be 150 to 200 hr. the general circuitry accounted for only 20% of the failures, and the transmitter, receiver, and certain special parts contributed the most failures.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Experience gained from reliability trials on an airborne radar


    Beteiligte:
    Green, J.E. (Autor:in) / Mead, P.H. (Autor:in)


    Erscheinungsdatum :

    1969


    Format / Umfang :

    5 Seiten, 8 Quellen


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Light Alloy Engines - Experience Gained from Research and Development

    Putter, Rainer Georg / Dahm, Wolfram | SAE Technical Papers | 1983


    Broad Experience Gained With Modular Cogeneration Plants

    Jost,A. / MAN,Augsburg | Kraftfahrwesen | 1983



    Ligth Alloy Engines - Experience Gained from Research and Development

    Dahm,W. / Putter,R.G. / Daimler-Benz | Kraftfahrwesen | 1983


    Operational Experience Gained From the Central Brae Subsea Field

    Sapp, S. J. / Gomersall, S. D. | British Library Conference Proceedings | 1994