Experience has proved that gravity platforms could be installed with maximum accuracy with the help of tugs. The main objective is to improve this accuracy to more or less 2 inches, so as to allow installation of a structure over a template, comprising a certain number of predrilled wells. Studies demonstrating the feasibility of such operations in complete reliability are progressing in this field. This type of installation allows the drilling operations while the structure is under construction. When the structure is installed, the conductors connection and well completions can be achieved. The time gained by such a method in platform exploitation is about one year. (Jensen)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Installation of a gravity structure over predrilled wells


    Weitere Titelangaben:

    Aufbau einer ortsfesten Plattform ueber vorgebohrten Bohrungen


    Beteiligte:
    Gerbault, M. (Autor:in) / Pilskin, L. (Autor:in)


    Erscheinungsdatum :

    1978


    Format / Umfang :

    6 Seiten, 11 Bilder, 2 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    GRAVITY OFFSHORE STRUCTURE AND INSTALLATION METHOD THEREOF

    Europäisches Patentamt | 2016

    Freier Zugriff

    GRAVITY OFFSHORE STRUCTURE AND INSTALLATION METHOD THEREOF

    LEE HEUK JIN / YOON GYOON JOONG | Europäisches Patentamt | 2016

    Freier Zugriff

    INSTALLATION STRUCTURE AND VEHICLE HAVING INSTALLATION STRUCTURE

    MURAMATSU YUKI / KOMURA TERUKI / OZAKI TOMOAKI et al. | Europäisches Patentamt | 2024

    Freier Zugriff

    Air-drop gravity type buffer air bag installation system

    ZHOU JUNMING / LI JINHONG / XIONG JIANGBO et al. | Europäisches Patentamt | 2022

    Freier Zugriff

    FLOATING STRUCTURE INSTALLATION SYSTEM AND FLOATING STRUCTURE INSTALLATION METHOD

    SATO KEI | Europäisches Patentamt | 2021

    Freier Zugriff