The Ninian Central Platform was built at Loch Kishorn by Howard-Doris for Cehvron (UK) Ltd. The paper discusses the design process together with the construction methods. Special emphasis is given to the maximum flexibility of the construction stages to optimise the overall construction duration by using various slipforms and extensive prefabrication. Emphasis is also given to the Kishorn Construction Yard and Facilities and to versatility to place modules eccentrically on the deck owing to the high resources of differential ballasting. (Kursetz)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Ninian field concrete gravity platform


    Weitere Titelangaben:

    Die Beton-Schwerkraft-Bohrplattform fuer das Ninian-Bohrfeld


    Beteiligte:
    Parat, J.L. (Autor:in) / Maher, D.R.H. (Autor:in)


    Erscheinungsdatum :

    1978


    Format / Umfang :

    16 Seiten, 6 Bilder


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Vibration based condition monitoring in the ninian field

    Murray, B.G. / Reid, A. / Sneddon, J.D. | Tema Archiv | 1986



    400000-t-Plattform fuer das Ninian-Oelfeld

    Howard Doris,GB | Kraftfahrwesen | 1977


    "St. Ninian" for Orkney and Shetland service

    Engineering Index Backfile | 1950


    "St. Ninian" for Orkney and Shetland Service

    Engineering Index Backfile | 1950