Decommissioning requirements for offshore renewable energy facilities in US federal waters requires that all facilities be removed and the seafloor be cleared of all obstructions at the end of the life of the lease. Before construction activities are permitted, developers are required to post a bond based on the estimated cost of decommissioning to ensure that the federal government is protected in case of company default. The purpose of this note is to provide weight algorithms of offshore wind farm components to estimate the lift requirements in decommissioning, the scrap value of material, and disposal cost. Weight algorithms are calibrated and compared with North Sea project data and examples illustrate the procedures. The component weights at the Cape Wind farm offshore Massachusetts are estimated.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Offshore wind structure weight algorithms


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    2014-11-02


    Format / Umfang :

    6 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    OFFSHORE STRUCTURE FOR INSTALLING OFFSHORE WIND TURBINE

    CHOI BYUNG KON | Europäisches Patentamt | 2023

    Freier Zugriff

    FLOATING TYPE OFFSHORE WIND STRUCTURE HAVING IMPROVED STRUCTURAL STRENGTH AND REDUCED WEIGHT

    KIM BOO KI / KIM KYONG HWAN / PARK SE WAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff

    Offshore foundation structure and offshore wind turbine system

    CHEN JIAHAO / YANG MINDONG / MA ZHAORONG et al. | Europäisches Patentamt | 2020

    Freier Zugriff


    FLOATING OFFSHORE WIND POWER STRUCTURE

    KIM BOO KI / KIM KYONG HWAN / PARK SE WAN et al. | Europäisches Patentamt | 2023

    Freier Zugriff