This study introduces an innovative bi-level model to address the challenges of managing traffic flow in construction work zones in urban transportation networks. The model integrates ramp closure, lane reorganization, and signal timing strategies within a network-level framework, thereby capturing the interdependencies between these strategies and enhancing the overall performance of the transportation network. The upper level optimizes the ramp closure locations, traffic control timing at signalized intersections and lane reorganization plans, whereas the lower level determines the optimal routing choice and traffic detour based on a Stochastic User Equilibrium (SUE) model. A Genetic Algorithm (GA)-based heuristic method is proposed to solve the optimization problem, and a case study demonstrates the effectiveness of the proposed approach. This study offers a comprehensive and innovative solution to mitigate the negative impacts of detour traffic on urban transportation networks, assist transportation agencies in effectively managing traffic flow and improve the overall system performance.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Joint optimization of ramp closure, lane reorganization, and signal control strategies for freeway mainline closure owing to construction zones


    Beteiligte:
    Ma, Wanda (Autor:in) / Li, Peng (Autor:in) / Zhao, Jing (Autor:in)


    Erscheinungsdatum :

    2023-12-31




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Harbor Freeway Ramp Closure

    R. T. Johnson | NTIS | 1966




    Design Guidance for Freeway Mainline Ramp Terminals

    D. J. Torbic / J. M. Hutton / C. D. Bokenkroger et al. | NTIS | 2012


    Effects of Ramp Spacing on Freeway Mainline Crashes

    Guo, Y.Q. | British Library Conference Proceedings | 2011