In this paper, we propose a study of the decision horizon duration for rolling stock mission assignment and maintenance planning in a prognostics and health management (PHM) context. The aim is to determine the best decision horizon duration that allows the construction of a suitable schedule that assigns railway vehicles to missions and integrates required maintenance operations according to the current and future health of the vehicles. A genetic algorithm is used to minimize the overall cost of the joint schedule as a function of the decision horizon. The results are compared to three proposed heuristics to study the influence of the resolution method on the decision horizon duration. The best decision horizon duration is given for each used method for an illustration case.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Impact of decision horizon on post-prognostics maintenance and missions scheduling: a railways case study


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    2022-07-04


    Format / Umfang :

    31 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Horizon Missions Technology Study

    British Library Conference Proceedings | 1992


    Horizon Missions Technology Study

    Anderson, John L. | NTRS | 1992



    Special Issue on prognostics and health monitoring in railways

    Bruni, Stefano / Roberts, Clive | SAGE Publications | 2016


    Data-driven predictive maintenance scheduling policies for railways

    Lopes Gerum, Pedro Cesar / Altay, Ayca / Baykal-Gürsoy, Melike | Elsevier | 2019