In this study, we focus on the development of work team routing/scheduling models incorporating stochastic travel and repair times. Robust and expected optimization concepts, combined with a time–space network technique, are used to develop the models. We perform numerical tests based on operational data for Taoyuan County in Taiwan. The test results show the good performance of the models.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Short-term work team scheduling models for effective road repair and management


    Beteiligte:
    Tang, Ching-Hui (Autor:in) / Yan, Shangyao (Autor:in) / Chang, Chia-Wei (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2009-06-01


    Format / Umfang :

    23 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt





    Scheduling Models for Short-Term Railway Traffic Optimisation

    Mascis, A. / Pacciarelli, D. / Pranzo, M. | British Library Conference Proceedings | 2008


    Scheduling Models for Short-Term Railway Traffic Optimisation

    Mascis, Alessandro / Pacciarelli, Dario / Pranzo, Marco | Springer Verlag | 2008


    Work cell team management

    Springer,R. / Daimler-Benz,Stuttgart,DE | Kraftfahrwesen | 1994


    Cost‐Effective Measures for Reducing Road Fatalities in the Short Term

    Rizzi, Luis Ignacio / Cumsille, Sebastián / Fresard, Francisco et al. | Taylor & Francis Verlag | 2011