Abstract This paper describes the method of creating an aircraft level system integration test facility by connecting distributed individual system test integration benches using a fiber–optic network and signal acquisition and reconstruction. The facility has been used for x type aircraft integration testing to support first flight. The experience proved this aircraft level system integration test facility can satisfy the aircraft function integration test requirements. Connecting existing system test facilities to reduce the integration tasks on the aircraft reduced the time taken to get to first flight. The cost of a new aircraft level system test facility was saved by reusing the distributed test resources.
An Aircraft Level System Test Facility Based on Individual System Test Benches
The Proceedings of the 2018 Asia-Pacific International Symposium on Aerospace Technology (APISAT 2018) ; 2 ; 1322-1329
Lecture Notes in Electrical Engineering ; 459 , 2
2019-01-01
8 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
LabVIEW RT based test benches for FlexRay ECUs
Tema Archiv | 2007
|Torque measurement uncertainty in wind turbine test benches
TIBKAT | 2021
|Conception of automatic test benches for hydraulic components
British Library Conference Proceedings | 1998
|New Procedure for Signal Compression in Test Benches
SAE Technical Papers | 2001
|Design criteria and instrumentation of hydrogen test benches
Tema Archiv | 2006
|