Abstract The In accordance with the standard calculating method, the influence factors analysis of high-speed railway train headway is carried, and the technical measures of cutting down the train headway is proposed. Based on CRH380AL EMU with the speed of 300 km/h, the contrast of the train tracing interval of Beijing-Shanghai high-speed rail before and after the control is obvious, which is calculated by the traction calculation simulation software. The result proved the probability of setting the train headway as 4 min on Beijing-Shanghai high-speed rail. In addition, the experiment examine the technical measures of cutting down the train headway is scientific and reasonable.
Technical Measures of Controlling Train Headway on High-Speed Railway
Advances in Smart Vehicular Technology, Transportation, Communication and Applications ; 1 ; 124-132
2018-12-01
9 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
Train Headway Calculation and Simulation System for High-Speed Railway
Springer Verlag | 2017
|Effective Solutions to Shorten Train Headway of Urban Railway
TIBKAT | 2020
|Train Headway Models for Super-Speed Maglev Systems
British Library Conference Proceedings | 2003
|Train Cooperative Control for Headway Adjustment in High-Speed Railways
British Library Conference Proceedings | 2017
|