Abstract The problem of the developed Innovative On-demand Bus service with cloud computing technology is that the scheduling algorithm cannot correspond to the complicated request from local government. This is because the same calculation algorithm is introduced to all services. In order to answer the complicated requirement for the On-demand Bus scheduling algorithm from each project, the project adapted scheduling algorithm is developed and evaluated by the computer simulation experiment. According to the result of computer simulation, the proposed scheduling algorithm performed as designed and it is proved that the developed scheduling algorithm can calculate the schedule of the On-demand Bus in answering the complicated requirement from each project by adjusting the parameter.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Adapted Scheduling Algorithm for On-Demand Bus System


    Beteiligte:


    Erscheinungsdatum :

    2012-01-19


    Format / Umfang :

    11 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Intelligent charging demand scheduling system

    DU JINQIAO / YU PENG / LUO XIN'ER | Europäisches Patentamt | 2020

    Freier Zugriff




    Costing, scheduling and demand

    Wallis, Ian / Barnard, Peter | Taylor & Francis Verlag | 1991