Construction project schedule is to bring the completion time and the total cost into balance by allocating resources. In order to shorten the completion time and decrease the total cost as far as possible, three time-resource-cost trade-off models for construction project under uncertain environment, including expected value (E-V) model, chance-constrained (C-C) model and chance maximization (C-M) model, were built by using uncertain theory. The duration time of activities, the allocation time of material resources and human resources are considered as uncertain variables in the three models. The E-V model was to shorten the expected completion time under the chance constraint of cost. The C-C model was to obtain the minimum completion time under the chance constraints of completion time and cost. The C-M model was to maximize the chance that the completion time is not lager than the due date under the chance constraint of cost. For the convenience of calculation, the three models were changed into crisp equivalent form. A practical case study was provided to show the application process of three models and the results can be obtained by using the genetic algorithm. Finally, some extended construction project scheduling models are introduced.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Uncertain Time-Resource-Cost Trade-Off Models for Construction Project Schedule


    Weitere Titelangaben:

    KSCE J Civ Eng


    Beteiligte:
    Hu, Changming (Autor:in) / Wang, Juan (Autor:in) / Mei, Yuan (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2021-08-01


    Format / Umfang :

    8 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Project Cost and Schedule Risk Assessment

    Roberds, B. / National Research Council (U.S.) | British Library Conference Proceedings | 2008


    Space project management - cost & schedule management

    European Cooperation for Space Standardization | SLUB | 1996


    Maglev Guideway Cost and Construction Schedule Assessment

    Plotkin, D. / Kim, S. | British Library Online Contents | 1997



    Impact of Utilizing Construction Engineering and Inspection Consultants on Highway Construction Project Cost and Schedule Performance

    Li, Ying / Al-Haddad, Sara / Taylor, Timothy R. B. et al. | Transportation Research Record | 2019