Abstract Schedule delays commonly occur in construction projects and often result in delay claims. Several studies have proposed different schedule delay analysis methodologies. By using as-planned and as-built schedules, most previous studies have concentrated on calculating the impact of identified delay events on project duration but have neglected to connect impact calculation from detailed delay evidence in their analyses. Lost productivity, which is a primary cause of schedule delays, entails the completion of work at less than the planned rate of production; it is usually experienced by contractors. To solve analysis problem of schedule delays associated with lost productivity, this study proposes a delay analysis method (the LOPE method) that integrates a lost productivity calculation approach and a well-known schedule delay analysis method, the collapsed as-built method. As demonstrated through a simplified case study, the proposed method is beneficial for calculating the impacts of schedule delays caused by lost productivity.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Incorporating lost productivity calculation into delay analysis for construction projects


    Beteiligte:
    Yang, Jyh-Bin (Autor:in) / Huang, Kuei-Mei (Autor:in) / Lee, Chang-Hung (Autor:in) / Chiu, Chui-Te (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    2014-03-01


    Format / Umfang :

    9 pages




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Incorporating lost productivity calculation into delay analysis for construction projects

    Yang, Jyh-Bin / Huang, Kuei-Mei / Lee, Chang-Hung et al. | Online Contents | 2014


    Incorporating negative externalities into productivity assessments of US airports

    Scotti, Davide / Dresner, Martin / Martini, Gianmaria et al. | Elsevier | 2014




    Incorporating Predictability Into Cost Optimization for Ground Delay Programs

    Liu, Yi / Hansen, Mark | British Library Online Contents | 2016