Flexibility for all different models within one body shop production line could be achieved without changing jigs, grippers as well as joining tools. A comprehensive analysis of the process chain formed the basis for the necessary development steps. In addition, planning methods based on mathematical optimization algorithms were developed and applied to cope with the complexity of the task. All the individual aspects are obtained, and the newly developed components were combined into a complete plant concept and its economic efficiency has been proven by Volkswagen planning department.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    The Fully Flexible Body Shop – A Holistic Approach for the Vehicle Production of Tomorrow


    Weitere Titelangaben:

    ARENA2036


    Beteiligte:
    Weißgraeber, Philipp (Herausgeber:in) / Heieck, Frieder (Herausgeber:in) / Ackermann, Clemens (Herausgeber:in) / Todtermuschke, Marcel (Autor:in) / Voigt, Alexander (Autor:in) / Fritzsche, Rayk (Autor:in) / Lippmann, Jens H. (Autor:in) / Zastera, Jörn (Autor:in)


    Erscheinungsdatum :

    2021-06-02


    Format / Umfang :

    8 pages





    Medientyp :

    Aufsatz/Kapitel (Buch)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    The Fully Flexible Body Shop – A Holistic Approach for the Vehicle Production of Tomorrow

    Todtermuschke, Marcel / Voigt, Alexander / Fritzsche, Rayk et al. | TIBKAT | 2021


    Training shop men of tomorrow

    Engineering Index Backfile | 1940



    Vehicle materials today and tomorrow

    Miyata,S. / Nissan Motor,JP | Kraftfahrwesen | 1991


    Coupled System Pavement—Tire—Vehicle : A Holistic Computational Approach

    Kaliske, Michael ;Oeser, Markus ;Eckstein, Lutz | TIBKAT | 2021