Taking the Chongqing via Chishui to Xuyong (Sichuan border) expressway project as an example, this paper focus on predicting trip generation, trip distribution, and trip assignment through a four-step model based on motor vehicle Origin-Destination surveys. The location of the project is rich in tourism resources. The construction of this project will promote the development of surrounding tourism resources and generate a large amount of tourism traffic. So, special consideration is given to the characteristics of tourism traffic in the project. The paper obtains the traffic volumes of the Chongqing via Chishui to Xuyong (Sichuan border) expressway.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Practice of the travel forecasting model of CCX-expressway accommodating tourism travel


    Beteiligte:
    Liang, Zhou (Autor:in)

    Kongress:

    International Conference on Frontiers of Traffic and Transportation Engineering (FTTE 2022) ; 2022 ; Lanzhou,China


    Erschienen in:

    Proc. SPIE ; 12340


    Erscheinungsdatum :

    2022-11-21





    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch



    Practice of the travel forecasting model of CCX-expressway accommodating tourism travel

    Liang, Zhou | British Library Conference Proceedings | 2022


    Studies on Travel Demand and Traffic Forecasting for China's Expressway

    Jia, Y. / Xie, H. | British Library Conference Proceedings | 1998


    An Approach for Dynamic Route Travel Time Forecasting on Urban Expressway Network

    Shao, C. / Asai, K. / Nakagawa, S. et al. | British Library Conference Proceedings | 2000


    Urban expressway short-distance travel control method

    ZHANG XIQIAO / LUO YULE / ZUO HAOJIE et al. | Europäisches Patentamt | 2020

    Freier Zugriff