The problem of testing large gas turbines at full load in the factory has been solved with the construction of a load test facility utilizing a gas turbine compressor as the load absorption device. Design philosophy and features are reviewed, and a summary, of operating experience to date is presented.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    100,000 HP Gas Turbine Load Test Facility


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Allen, Roy P. (Autor:in) / Smith, Thomas F. (Autor:in)

    Kongress:

    1976 Automotive Engineering Congress and Exposition ; 1976



    Erscheinungsdatum :

    1976-02-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Test of an ingoldsby 100,000 lbs

    Engineering Index Backfile | 1902


    100,000 lbs

    Engineering Index Backfile | 1901



    Canda's 100,000 lbs. capacity cars

    Engineering Index Backfile | 1899


    Diesel-electric locomotives save $100,000

    Dalgleish, Jr., R.H. | Engineering Index Backfile | 1937