The family of planning and scheduling techniques known generally as critical path analysis has received wide publicity in the past few years as a tool for planning major industrial projects such as the building of ships, or factories, or the development of missiles and spacecraft. The application of this technique to the scheduling problem of overhauling turbine aircraft and engines has produced the following results: improved descriptions of the detailed work involved with an overhaul; effective centtalized control over the various phases of the overhaul; logical sequencing of the many and varied jobs to be done in the highly complex and specialized aircraft systems; improved parts availability; reduced out-of-service time of the aircraft being overhauled.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Airline Management of Overhaul Processes with Critical Path Methods


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Raymond, E. (Autor:in) / Morrison, W. R. (Autor:in)

    Kongress:

    Pre-1964 SAE Technical Papers ; 1906



    Erscheinungsdatum :

    1963-01-01




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch