An overview of the proposed operational methods for performing Extravehicular Activity (EVA) maintenance for the International Space Station (ISS) is provided. External maintenance of ISS will be required during assembly and will continue for at least ten years after assembly is complete. It is likely that the operational methodology for performing maintenance will evolve as more on-orbit ISS EVA experience is gained. However, an initial operational plan is necessary for timeline and tool development. Initial operational concepts outlining assumptions regarding how EVA operations will be conducted during maintenance of ISS after assembly complete are provided. These maintenance scenarios are designed to reduce overhead wherever possible in order to make the EVA operations more efficient. Also presented is a summation of orbital replacement unit (ORU) information as it pertains to the operational concept.
EVA Concept of Operations for International Space Station Maintenance
Sae Technical Papers
International Conference On Environmental Systems ; 2000
2000-07-10
Aufsatz (Konferenz)
Englisch
SAE Technical Papers | 2004
|British Library Conference Proceedings | 2001
|International Space Station Alpha User Payload Operations Concept
British Library Conference Proceedings | 1994
|