Coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NOx reduction (SCNR). For repowering of a single 250 MWe unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MWe units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    MHD Repowering of a 250 MWe Unit of the TVA Allen Steam Plant


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Chapman, J. N. (Autor:in) / Attig, R. C. (Autor:in)

    Kongress:

    27th Intersociety Energy Conversion Engineering Conference (1992) ; 1992



    Erscheinungsdatum :

    1992-08-03




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Introduction to Repowering

    Online Contents | 1995



    Repowering cement freighter J.B.John

    Bolotin, M.L. | Engineering Index Backfile | 1951