NASA's first Air Traffic Management Technology Demonstration (ATD-1) successfully completed a nineteen-day flight test under a NASA contract with Boeing, with Honeywell and United Airlines as sub-contractors. An Interval Management (IM) avionics prototype was built based on international IM standards, integrated into two test aircraft, and then flown in real-world conditions to determine if the goals of improving aircraft efficiency and airport throughput during high-density arrival operations could be met. This paper describes the speed behavior of the IM avionics prototype, focusing on the speed command rate and the number of speed increases.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    An Analysis of the Speed Commands from an Interval Management Algorithm during the ATD-1 Flight Test


    Beteiligte:

    Erscheinungsdatum :

    2017-11-01


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch







    Flight Interval Management Graphical Speed Performance Monitor

    BARBER SARAH / TURCIOS FELIX B | Europäisches Patentamt | 2020

    Freier Zugriff

    Flight interval management graphical speed performance monitor

    BARBER SARAH / TURCIOS FELIX B | Europäisches Patentamt | 2023

    Freier Zugriff