A key component of any cost risk analysis is the level of correlation between individual elements of cost. This analysis supplements the available historical records with the cost estimates from the JPL Advanced Design Team. The costs from actual JPL flight projects are then used to validate the results, clearly indicating that, on average, the correlation between elements of cost is between 0.4 and 0.7.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Correlation of Spacecraft Mission and Project Costs


    Beteiligte:

    Kongress:

    NASA Cost Symposium ; 2007 ; Denver, CO, United States


    Erscheinungsdatum :

    2007-07-17


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Mission operations costs for scientific spacecraft: the revolution that is needed

    Ledbetter, K. W. / International Academy of Astronautics | British Library Conference Proceedings | 1995



    Spacecraft mission design

    Brown, Charles D. | SLUB | 1996


    Surveyor spacecraft mission

    Stoolman, L. | Engineering Index Backfile | 1963


    Spacecraft mission design

    Brown, Charles D. | TIBKAT | 1998