An overview of the development of a treadmill for the International Space Station is presented. Topics discussed include: flight certification of a Commercial Off the Shelf (COTS) Woodway Path treadmill; development and certificaiton of a crew interface to optimize use of the COTS design and/or existing NASA design (such as the ARED Pacebook); development and certification of a power supply to provide power from the ISS Vehicle to the treadmill system (crew interfaces, motor, controller and subject loading devices).
2nd ISS Treadmill Development "T2 Project"
3rd Bi-annual Countermeasures Summit ; 2007 ; Houston, TX, United States
2007-03-07
Aufsatz (Konferenz)
Keine Angabe
Englisch