The briefing opened with Bruce Buckingham (NASA Public Affairs) introducing John Shannon (Chairman, Mission Management Team, JSC), John Chapman (External Tank Project Manager), Mike Leinbach (Shuttle Launch Director), and 1st Lt. Kaleb Nordgren (USAF 45th Weather Squadron). John Shannon reported that the team for hydrogen loading was proceeding well and the external tank detanking was completed. During detanking the inspection team cracked foam caused by condensation and ice formation as the tank expanded and contracted. Aerothermal analysis and analysis fro ice formation will be completed before launch. John Chapman explained the mechanics of the external tank design, the foam cracking, bracket design, etc. Mike Leinbach discussed the inspection teams and their inspection final inspection for ice formation before and after external tank filling. The inspection team of eight very experienced personnel also use telescopes with cameras to find any problems before launch. Kaleb Nordgren discussed weather and said there was a 40% chance of weather prohibiting launch. The floor was the opened for questions from the press.
STS-121: Discovery Mission Management Team Briefing
2006-07-03
Audiovisuelles Material
Keine Angabe
Englisch
STS-114: Discovery Mission Status Briefing
NTRS | 2005
STS-114: Discovery Mission Status Briefing
NTRS | 2005
STS-121: Discovery Mission Overview Briefing
NTRS | 2006
STS-121/Discovery: Mission Status Briefing
NTRS | 2006