During the Coupled Ocean Atmosphere Response Experiment (COARE) six TAO moorings were equipped with optical rain gauges (ORG's). In late 1993 moorings deployed on the equator at 154E and 157.5E were recovered and not redeployed as they were augmentations to the TAO array for COARE only. In December 1993, four TAO moorings were equipped with ORG's: one each at 2N, 156E and 2S, 156E and ORG doublets on the equator at 0, 156E and 0, 165E. The 2N, 156E mooring has been lost. By the end of April all sites will have been serviced and six refurbished sensors will again be deployed in the same locations.
Update on TAO moored ORG array
1994-12-01
Aufsatz (Konferenz)
Keine Angabe
Englisch