The Mars Observer spacecraft will reach Mars on August 24, 1993. Launch and cruise phase operations have gone smoothly, with few spacecraft anomalies. The orbit insertion phase, which spans a three month period and involves a series of seven maneuvers, has been redesigned postlaunch making use of excess spacecraft velocity change (Delta V) capability to advance the mapping phase, now planned to begin November 24, 1993. This is highly desirable since it moves the start of the mapping phase away from solar conjunction and the expected dust storm disturbances. The redesign process involved making tradeoffs between science, operations, and maneuver requirements. At Mars, the spacecraft will continuously record data with a single daily playback through the Deep Space Network's 34-meter high-efficiency antennas for one Martian year.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Mars Observer mission status and orbit insertion phase planning


    Beteiligte:

    Kongress:

    IAF, International Astronautical Congress ; 1993 ; Graz, Austria


    Erscheinungsdatum :

    1993-10-01


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :


    Planning the Mars Observer Orbit Insertion Phase

    Dodd, Suzanne / Roncoli, Ralph | NTRS | 1993


    Mars Observer Lecture: Mars Orbit Insertion

    Dodd, Suzanne R. | NTRS | 1993




    Precision Orbit Determination for the Mars Observer Mission

    Nerem, R. S. / Lemoine, F. G. / Marshall, J. A. et al. | British Library Conference Proceedings | 1993