A flight experiment which proposes to use a 60-m deployable/retractable truss beam attached to the Space Shuttle to study dynamic characterization and control of flexible structures is being studied by NASA. The concept requires a relatively complex mechanism for deploying and retracting the truss on-orbit. Development of such a mechanism having a high degree of reliability will be expensive. An alternative method for constructing the truss is discussed requiring no new technology development or complex mechanisms and has already been demonstrated on-orbit. The alternative method proposes an erectable truss beam which can be assembled by two astronauts in EVA. The EVA crew would have to manually assemble the beam from 468 struts and 165 nodes, and install 7 instrumentation platforms with signal and power cabling. The predicted assembly time is 3 hr and 23 min. The structure would also have to be disassembled and restowed following testing, thus 2 EVA days would be required. To allow 25 hr for data collection (probably a bare minimum to accomplish meaningful tests), current Shuttle operations policy dictates a 9-day mission. The design, assembly procedure and issues associated with the alternative concept are discussed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    A 60-meter erectable assembly concept for a control of flexible structures flight experiment


    Beteiligte:

    Erscheinungsdatum :

    1988-02-01


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch







    A concept for high speed assembly of erectable space platforms

    COHAN, H. / JACQUEMIN, G. / JOHNSON, R. | AIAA | 1981


    Erectable Truss Hardware for Large Space Structures

    Dick, R. E. / Faddis, T. N. / Barr, B. G. | British Library Conference Proceedings | 1994