This paper presents the techniques and analyses that were used to construct the Spartan 101 mission pointing timeline for the Space Shuttle Orbiter-detached portion of its flight. This covers the design process that had to transform requirements and constraints originating from the experimenter, the Space Transportation System, and the payload hardware design into a workable set of pointing instructions sequenced to mission events. The paper will discuss the technical approach used for initial attitude acquisition, determining target visibility, observation scheduling, and calculation of vehicle maneuvers.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Development of the Spartan 101 navigation and pointing timeline


    Beteiligte:
    Lambros, S. D. (Autor:in) / Olney, D. J. (Autor:in) / Watzin, J. G. (Autor:in)

    Erscheinungsdatum :

    1986-01-01


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Development of the Spartan 101 navigation and pointing timeline

    LAMBROS, S. / OLNEY, D. / WATZIN, J. | AIAA | 1986




    Spartan

    Engineering Index Backfile | 1930


    Spartan "Cruiser"

    Engineering Index Backfile | 1932