System between the Titan/Centaur launch vehicle and its aerodynamic shroud is described. The system provides a precise spring constant and is capable of being inactivated during flight. Design requirements, design details, and the test program are discussed. The conventional English system of units was used during this development program for all principal measurements and calculations.
Forward bearing reactor mechanism for Titan 3-E/Centaur D-1T space launch vehicle
1975-08-01
Aufsatz (Konferenz)
Keine Angabe
Englisch
Titan/Centaur - NASA's newest launch vehicle
AIAA | 1973
|FIRST TITAN IV-CENTAUR LAUNCH PUTS MILSTAR INTO ORBIT
Online Contents | 1994
|First Milshr lies dormant awaiting fall launch - Awaiting launch on a Titan-Centaur booster
Online Contents | 1993
Atlas/Centaur Launch Vehicle Operation Experience
SAE Technical Papers | 1968
|