All analyses and tradeoffs conducted to establish the MSS operations and crew activities are discussed. The missions and subsystem integrated analyses that were completed to assure compatibility of program elements and consistency with program objectives are presented.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Modular space station phase B extension preliminary system design. Volume 2: Operations and crew analyses


    Beteiligte:
    Meston, R. D. (Autor:in) / Schall, M. R., Jr. (Autor:in) / Brockman, C. L. (Autor:in) / Bender, W. H. (Autor:in)

    Erscheinungsdatum :

    1972-01-01


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :