The project proposes to construct a barge docking facility parallel to the navigation channel. The dock will be located on Government property with the storage area located on adjacent private property. The off-channel location will decrease chances of vessel collision. The excavation material will be placed ashore to raise the elevation of the storage area thereby reducing vegetative productivity of the land. Noise level will be raised due to increase in traffic and commercial activities. Appearance of the area will change from a rural to an industrial setting. Adverse environmental effects: Loss of the excavated land area for the dock, loss of agricultural productivity due to change in land use.
Port Verdigris 33, Inc., Verdigris River, Oklahoma
1972
27 pages
Report
Keine Angabe
Englisch
HENRY – Bundesanstalt für Wasserbau (BAW) | 1973
|Spillway for Kaw Dam, Arkansas River, Oklahoma: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1970
|Spillway for Hugo Dam, Kiamichi River, Oklahoma: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1969
|Engineering Index Backfile | 1931
|Spillway for Copan Dam, Little Caney River, Oklahoma: Hydraulic Model Investigation
HENRY – Bundesanstalt für Wasserbau (BAW) | 1970
|